Loading
Call Us: +977 01-4101034
Email Us: precise.hydro@yahoo.com
Home
About
Organization Structure
Board Of Director
Our Team
Services
Projects
OnGoing Projects
Completed Projects
Contact Us
OnGoing Projects
UPPER CHIRKHWA HYDROPOWER, 4.7 MW
01
Upper Chirkhuwa Hydropower Project is a run-of-river hydro-electric plant with capacity 4.7 MW located in Shadananda Municipality, Bhojpur District.
CONTINUE RED
BUKU KAPTI HYDROPOWER PROJECT, 5 MW
02
Buku Kapti Hydropower Project is a Run-of-River type hydropower project with generating capacity of 5.0 MW in Solukhumbu and Okhaldhunga District.
CONTINUE RED
DOWN PILUWA KHOLA HYDRO POWER PROJECT, 10.3 MW
03
It is a Run-of-River type hydropower project with generating capacity of 10.3 MW in Sankhuwasabha District.
CONTINUE RED
UPPER SURI KHOLA HEP, 7 MW
04
It is a run-of-river type of hydropower with the installed capacity of 10 MW located at Gaurishanker Rural Municipality -5 of Dolakha district.
CONTINUE RED
SUPER HEWA KHOLA HEP, 5 MW
05
Super Hewa HEP is a run of river hydro electric project with the installed capacity of 5 MW located in Sankhuwasava district.
CONTINUE RED
MATHILLO GADIGADH HEP, 1 MW
06
CONTINUE RED
BALEPHI HYDRO POWER PROJECT, 22 MW
07
Balephi HEP is a run of river hydro electric project with the installed capacity of 22 MW located in Sindhupalchowk district.
CONTINUE RED
UPPER PILUWA HEP, 4.99 MW
08
It is a run-of-river type of hydropower with the installed capacity of 4.99 MW located at Sankhuwasava district.
CONTINUE RED
SELANG KHOLA HEP, 1.5 MW
09
Balephi HEP is a run of river hydro electric project with the installed capacity of 1.5 MW located in Sindhupalchowk district.
CONTINUE RED
Developed By
ITglance
2021. All Rights Reserved.
Extra Pages
Home
Blog
Blog Single
Left Sidebar
Right Sidebar
Full Width