Buku Kapti Hydropower Project is a Run-of-River type hydropower project with generating capacity of 5.0 MW in Solukhumbu and Okhaldhunga District. The plant is owned and developed by Himstar Urja Company Limited.
The scope of work comprises of Design, Manufacturing, Supply, Erection, and commissioning of Hydro mechanical for this prestigious Project of 5MW HPP, which includes Bellmouth, Bend, Saddle Plate, HDEP Sheet, expansion Joint, Manhole, and Bifurcation, Trash rack, Gates, Stop logs etc.
Salient Features:
Gross Head: 255 m
Total Alignment Length: 3658 m
Headrace and Penstock Pipe Thickness Range: 6-18 mm
Headrace and Penstock Pipe Diameter Range: 1.3 m -1.1 m