Super Hewa HEP is a run of river hydro electric project with the installed capacity of 5 MW located in Sankhuwasava district.
The scope of work comprises of Design, Supply, Fabrication, Transportation, Installation, and Commissioning of Hydro-mechanical works & painting, Erection, Testing, and Commissioning works of spiral pipe supplied and a guarantee of the supplier’s and Transportation of Penstock and Gate works for this prestigious Project of 5 MW HPP, which includes Bellmouth, Bend, Saddle Plate, HDEP Sheet, expansion Joint, Manhole, Bifurcation, Trash rack, Gates, Stop logs, Hoistings etc.
Salient Features:
Total Capacity : 5 MW
Total Alignment Length: 3146.55 m
Headrace and Penstock Pipe Thickness Range: 7mm - 20 mm
Headrace and Penstock Pipe Diameter Range:1.35 m -1.15 m (Headrace) and 1.05 m - 0.74 m (Penstock)