Kabeli B-1 Cascade Hydroelectric Project is a Run-of-River type hydropower project with generating capacity of 9.94 MW . The 9.94-MW project is located in between Panchthar and Taplejung districts. The plant is owned and developed by Arun Valley Hydropower Development Company Limited.
The scope of work comprises of Design, Manufacturing, Supply, Erection and commissioning of Hydro mechanical portion of the project, which includes Transition, Headrace Pipe, Bends, Saddle Plate, HDEP Sheet, Expansion Joint, Manhole, Trash rack, Gates, Stop logs, Hoisting, Power House Staircase, Roof Truss, Power house entrance gate etc.
HM work start date: 2077/10/2
HM work completion date: 2078/10/16
Completed under the in-chargeship of Er. Kushal Ghimire
Salient Features
Gross Head: 35m
Total Capacity: 9.94 sMW
Total Headrace Alignment Length: 1234 m
Total Penstock Alignment Length: 105 m
Headrace and Penstock Pipe Thickness Range: 12-10 mm
Headrace and Penstock Pipe Diameter Range: 3.75-2.2 m